I understand that it will have no affect on ABIST2 if SVS is configured or not.
But if SVS is not configured, what is the meaning to enable ABIST2 while ABIST1 has already covered and checked the voltage error that ABIST2 do?
VR550-Flowchat.png
VR5510-ABIST.png