Hi team,
Here is the measure result of i.mx7 power down sequence.
Could you advise me for following result?
Any risk it could be while the power down sequence can't be meet?
1.VDD_ARM_IN&SW2_1V8&VLDO1_1V8 get to GND to VSNVS ramp down ,the result is -23.91s. ( Power off)

2.NVCC_DRAM&DDR_VREF power down to VDD_SOC_IN power down, the result is -1.68s. ( Power off)

3.VLDO3_3V3&NVCC_3V3&NVCC_SD1 get to GND to VSNVS ramp down, the result is -2.40s. ( Power off)

4.VCC_5V&VDD_SOC_IN get to GND to VSNVS ramp down, the result is -8.49s. ( Power off)

And another question about the power down requirement of PF3000.
VDDIO would be higher than VIN within 1.31s when power off the system.
Is this requirement to be followed even in power down?