Using DDRv, you can choose:
- BIST tests, which are the DDR controller build in tests and will test all the memory using only the controller
- DMA test
- WRC, WO, WZ, which allow you to set the pattern, the size and the start address
- Custom test, which allow you to customize the DDR test
If all the tests from Operational DDR tests are passing, this means your DDR configuration is valid. Starting with this configuration you can run the other validation tests to get the best DDR configuration.
Adrian