Hi NXP team,
I can transmission/reception data with MC33774ATP using Loopback Method 1.
How should I configure the MCAL to implement Loopback Method 2 and Loopback Method 3?
I've tried setting Loopback method 2, but no data received in actual operation. My settings are as follows (use TPL port0 & port1):
CHENGYANG_1-1768813755287.png
CHENGYANG_2-1768813772351.png
CHENGYANG_3-1768813786458.png
I can't find option of Loopback Method 3 in my environment, I use RTD3.0.0 & BMS SDK 1.0.1
CHENGYANG_0-1768813422638.png