Hi Teams,
We use PF3000 to supply i.mx7 dual processor.
The power up sequence of i.mx7 is correct.
When power off the the power supply to PF3000, the power down sequence of i.mx7 can not meet the spec. VSNVS would be turned down fast than some other power rail.
Would this violation to be acceptable?
Thanks.