There must be a way to eliminate the ICD - Connection Manager screen when going from CW to the Hiwave debugger. This wants you to select Connect or Hotsync or Abort. In version 3 there was a dialog box to do this but I have upgraded to version 5.
Hello
Which screen do you want to skip?
How are you connecting to your HCS08 board?
CrasyCat
If you start the debugger, a new application opens. At the lower right there is a status indicating Loading Target. This takes a few seconds. The next dialog box is titled ICD - Connection Manager. The text in the box says "You have selected to display this dialog on startup. Specify Communications Parameters and click OK”. This allows you to select the Interface and Port that the BDM is connected to. The buttons are Connect, Hot sync and Abort.
It would be great if the ability to unselect the display of this dialog. Then you could press the debug button in Code Warrior and when you look back, the debugger is up and waiting for you!
There was a way to do this in the version 3. Once I upgraded to 5, this was gone.
I am using a USB Multilink -ML-12. The target is a HCS08GB60.
Thanks for any advice.
James
Hi,
Doesn't really provide an answer but refer to here:
http://forums.freescale.com/freescale/board/message?board.id=8BITCOMM&message.id=1317
Regards David