My S32 Design Studio for Power Architecture will expire

取消
显示结果 
显示  仅  | 搜索替代 
您的意思是: 
已解决

My S32 Design Studio for Power Architecture will expire

跳至解决方案
439 次查看
kikimorisato
Contributor II

I received an email stating that my S32 Design Studio for Power Architecture will expire on January 22, 2024. I would like to inquire about the possibility of extending it.

0 项奖励
回复
1 解答
380 次查看
jiri_kral
NXP Employee
NXP Employee

Hi, 

your  S32DS for Power license has been extended. Please activate your S32DS again with your old code. 

在原帖中查看解决方案

0 项奖励
回复
2 回复数
381 次查看
jiri_kral
NXP Employee
NXP Employee

Hi, 

your  S32DS for Power license has been extended. Please activate your S32DS again with your old code. 

0 项奖励
回复
367 次查看
kikimorisato
Contributor II
My S32 Design Studio for Power Architecture license extension has been successfully applied. I was able to easily reactivate it using the previous code. Thank you for your assistance
0 项奖励
回复