Please provide the issue description in English.
Additional required information:
1) digital scope traces of RCW I2C readout (SCL, SDA) of the operational and faulty boards
2) the processor connection schematics as searchable PDF
3) confirm that all reset signals behave as shown in the QorIQ T2080 Reference Manual, Figure 4-1. Power-on reset sequence
4) confirm that TRST_B is pulsed low (asserted) during the POR sequence
Please provide the issue description in English.
Additional required information:
1) digital scope traces of RCW I2C readout (SCL, SDA) of the operational and faulty boards
2) the processor connection schematics as searchable PDF
3) confirm that all reset signals behave as shown in the QorIQ T2080 Reference Manual, Figure 4-1. Power-on reset sequence
4) confirm that TRST_B is pulsed low (asserted) during the POR sequence