AnsweredAssumed Answered

How to bind Output ON/OFF cluster to JN5189 coordinator (IoT control bridge).

Question asked by Bharadwaj Kollepara on May 8, 2020
Latest reply on May 18, 2020 by Mario Ignacio Castaneda Lopez

I am working with jn5189 as ZigBee coordinatore. I am trying to bind a LUMI mini switch ON/OFF cluster (Output cluster) with the coordinator. I am using iot-control-bridge workspace, I am sending "BIND REQUEST" to the switch and getting a bind response as success, but when I tried to trigger an event from the switch, I am not receiving any data in the zgui tool, but If I see the sniffer logs I am able to see that the switch is sending on/off command to the coordinator. 

 

The same "BIND REQUEST" is working for device having ON/OFF cluster as a input cluster. Can anyone explain what can be done?

Outcomes