Emerson Silverio

Production test equipment

Discussion created by Emerson Silverio on Dec 6, 2006
Latest reply on Dec 7, 2006 by David Payne
Hi,

I´m developing a production test equipment based on needles. In the way that I´m thinking, I will need to put 2 microcontrollers GT32 working in parallel (each pin connected with the other physically). The problem is that each microcontroller will execute differents programs. What problems can I find trying to do it?

Thanks

Emerson

Outcomes